Pie

A pie shows how a total splits into parts. Each slice is one value of a segmentation — or one measure — and its size is its share of the whole. Widen the hole and it becomes a donut.

When to use a pie

A pie answers one question well: how big is each part of the whole? It is the chart for a story about share — who leads, how concentrated something is, how much is left for everyone else.

  • Market and customer share — revenue by customer, bookings by airline, sales by region: is one part carrying the business?
  • Mix and composition — orders by channel, tickets by priority, spend by category: what is the total made of?
  • Concentration and risk — when one slice holds half the circle, the dependency is obvious at a glance, without reading a single number.

Reach for another chart when the question is different:

The question A better chart
Which part is bigger, when the parts are close in size? Bar chart — lengths are easier to compare than angles
How did the shares change over time? Stacked bars or lines, one per part
Parts that do not add up to a meaningful total (an average, a rate, a maximum) Bar chart — a pie's slices must sum to something real
Many parts, or parts inside parts Treemap
The total itself A Highlight card

Build a pie

  1. Click the mode picker at the top of the Explore sidebar.

  2. Under Chart, choose Pie.

  3. Click Add Measure and pick Price. The measure sizes the slices.

  4. Click Add Segment and pick Airline. Each airline becomes a slice.

Coming from a table or a bar chart, step 3 and 4 are already done — switching the type keeps your measures and segments. Build a Visualization walks the same path from the start.

Slices come from measures or from a segmentation

A pie draws one ring of slices, so it shows either one measure split by a segmentation or several measures side by side as the slices — never both at once. Instead of ignoring one of them, the sidebar replaces the blocked button with the one that resolves it:

  1. With a segmentation in place, Add Measure is replaced by More measures not available with segmentation and a Remove Segmentation button. Click it to drop the segmentation and add more measures.
  2. With two or more measures, Add Segment is replaced by Segmentation not available with multiple measures and a Keep One Measure button. Click it, pick the measure to keep, and the others move to Missing Measures, freeing the segmentation slot.

Both buttons are ordinary edits, so Undo brings the previous setup straight back.

Slice labels and the donut hole

The pie's own options sit in the chart settings below Filters, under the legend picker.

  1. Slice labels — the master switch. Off, the slices carry no text and no leader lines.
  2. Segment name — the slice's name in its label.
  3. Measure value — the slice's value in its label (off by default).
  4. Percentage — the slice's share of the total.
  5. Donut hole — drag the slider from 0 % (a solid pie) to 90 % (a thin ring); 30 % is the default.

The three label switches are independent — any combination is valid.

Options

Option Where Choices
Slice labels, Segment name, Measure value, Percentage Pie options See above
Donut hole Pie options 0 %–90 % in steps of 5
Legend Chart settings below Filters Automatic, top, bottom, left, right, in the title or no legend — see Legend. Auto Legend shows none for one measure by one segment, where the slice names already say everything
Slice colours Value Colors on the segmentation A slice wears its value's colour — the same one it has on every other chart, and the same one before and after a Top or Bottom limit — unless you pin another
Measure colour The measure row Used when the slices are measures — see Per-measure style
Sort An opened segment row The order of the slices, clockwise — see Sort order
Number format The measure row How values read in labels and tooltips — see Number format
Top or Bottom Below the segments Keep the largest slices; Include Others rolls the rest into one grey Other slice — see Top / Bottom N
Animate By… Below the slots Play the chart through time or a category — see Timeline

A pie has no axes and no orientation, so those controls are not shown.

Visualization tips

  1. Keep to a handful of slices. Past five or six, the small ones turn into slivers nobody can read. Add a Top / Bottom N limit with Include Others, so the long tail becomes one grey Other slice and the total stays whole.
  2. Sort largest first. With Highest to Lowest on the segment's Sort, the biggest slice starts at twelve o'clock and the rest follow clockwise — the reading order matches the ranking.
  3. Lead with the percentage. A pie is about share, so Percentage alone is usually the clearest label. Add Measure value when the absolute amounts matter too, such as revenue in a budget review.
  4. Move names to a legend when labels crowd. Turn off Segment name and pick a legend position; the slices keep only their numbers.
  5. Prefer a donut on dashboards. The ring reads as well as a solid pie and looks lighter beside other cards. Pair it with a Highlight card that shows the total — the pie shows the split, the card shows the size.
  6. Keep colours steady. A slice wears its value's colour on every chart, so an airline looks the same here as on a bar chart. Use Value Colors to pin a meaningful colour — your brand, or red for a problem category — rather than recolouring per chart.
  7. One pie, one point. Two pies side by side are hard to compare slice by slice; to compare shares between periods or regions, use stacked bars instead.

Pin it to a dashboard

Click Add to Dashboard in the Explore toolbar and pick a dashboard, or create one. See Save to a dashboard.

← Scatter, BubbleRadar →